Contact

EMW Construction – London Fit-Out Project

  1. Home
  2. Latest
  3. London Fit-Out Project

EMW Construction – London Fit-Out Project

EMW Construction – London Fit-Out Project

Our Construction Team have advised on and prepared, negotiated and completed the construction documentation for enabling works, Categories B and A fit-out and procurement of FF&E on a central London property for a large international bank.

The project is a high-tech refurbishment of existing premises using the latest technology and innovative design.  The documentation which they advised on ranged from the Invitation to Tender, JCT contract with development management features, appointments of design team and all other consultants and subcontracts covering most of the works, all with collateral warranties to be procured.  They have also provided ad hoc advice as to technical documentation and relevant insurance coverage, and drafted bespoke incentive mechanisms and cost control provisions in the documents where required.

The team, led by Caroline Watkins assisted by Luke Collins, have committed to assisting the client on an ongoing basis during the construction stage to ensure that contract behaviour from the project team is monitored and challenged where necessary.  This has been carried out against the backdrop of the construction industry’s major current issues such as slow and costly supplies, COVID-19 fluctuations, inflation and the incoming Building Safety Act rules and responsibilities.

Get in touch

If you would like to discuss this update or need any advice, please contact Caroline Watkins.